|
Area: North |
|
Dug in Year: 2005 |
Feature Type: wall |
|
Location: northern wall of space 258 |
|
Northern wall of SP258. Built at same time as 2044 not plastered on either side. The one problem with the sequence of events constructed in the phase plan is that the rebuilt northern and western walls appear to go below the surfaces in SP 258. It may be that the floors were rebuilt at the same time but it is difficult to be sure without excavation. |
|
In situ Conservation: No |
Lifted: No |
|
Feature Relationships: |
abuts: (Click to view the record) 2149 |
bonded with: (Click to view the record) 2044 |
|
Number of Related Diary Entries: 0 |
Conservation Recorded: No |
Buildings: (Click to view the record)
| Spaces: (Click to view the record)
| No. Of Units in this Feature: 1 (Click here to view unit list) |
|