|
Area: North |
|
Dug in Year: 2006 |
Feature Type: Post |
Feature Subtype: engaged post/pillar |
|
Location: north-east corner of building 60 space 278 |
|
Grid X: 1033.85 Grid Y: 1165.3 |
|
Engaged/unengaged pillaster column - built against wall F.2215 was constructed after plastering of wall - was dug into the demo material of building 59 (13115) directly infront of an old post scar.
One of three insitu pillars in Building 60 space 278 all show different styles of construction yet appear to have been erected during the same phase of construction after the plastering of wall F.2216 and 2215. |
|
In situ Conservation: No |
Lifted: No |
|
Feature Relationships: |
abuts?: (Click to view the record) 2215 |
|
Number of Related Diary Entries: 0 |
Conservation Recorded: No |
Related Photos: 7 (Opens as a group in a new window) | Buildings: (Click to view the record)
| Spaces: (Click to view the record)
| No. Of Units in this Feature: 4 (Click here to view unit list) |
|