Excavation Diary Entry

Name: JST 
Team:  
Date: 7/7/2008 
Entry: Started working in earnest on the pyrotechnic features in building 75 today, after spending most of last week beasting off dumped deposits and bringing the area generally into phase.

Started with a phased plan of Space 328 and the related raised space (as yet un-numbered) to the north, which was finished this morning. Now working on F2367, the oven on the south wall just ot the south of Moniques hearth. Took off the uppermost surface (16264) and should be tackling the next fill/make up tomorrow morning (16268). After discussion with Roddy we reached the consensus that there appear to be at least two possibly three phases of use and modification of the this structure (surfaces and addtitional brickwork. 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell