Entry: A few days have passed and I have been taking off floors in the middle of building 49. After the removal of the internal walls we are now in a new phase and have moved into space 335! After the removal of floors (14461( ıt looks lıke there ıs now a nıce floorsurface that runs under the lıttle bench/ plınth? In the NW corner of the buıldıng.

Tomorrow therefore I wıll move to the South of the room and begın makıng my way down to the ashy floor layers connected wıth the oven use. 
 