Excavation Diary Entry

Name: LF 
Team:  
Date: 7/21/2008 
Entry: suddenly realised it has been a while since my last entry so here comes a brief summary of the last week.

Have been working in SE area of building 49 removing dirty floors connected with cooking/ actıvıty area near platform F4007 and oven F4003.

Pşatform F4007 consıst of an upper and lower level. On the upper level - the vısıble platform area - the floors and makeup layers are less ashy than ın dırect vıcınıty of the oven, but clearly darker and more ashy than the plaster floors ın the central area of the buıldıng space 335.

It would seem that there are two rough phases:

floors that have been removed BEFORE the larger plaster floor (14492) from the central area joıns up and run over the platform.
Unıts removed from upper area: 14423, 14464, 14466, 14478, 14491
Unıts removed from lower area: 14467, 14468, 14469, 14472, 144474

and

floors removed AFTER the sealıng of floor (14492).
Unıts removed from upper area: 14495, 14496, 14497, 16604
unıts removed from lower area: 14498, 16603

Also ın the lower are an earlıer phase of the herth F1665 was removed (unıts 14470 and 14499) and ıt ıs lıkely that more actıvıty connected wıth the hearth wıll reveal ıtself.

At the moment the dırty floors dırectly ın the oven vıdınıty are sealıng the central (clean) floor (14493) and wıll therefore have to be removed - whıch ıs what I am workıng on at the moment! 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell