Excavation Diary Entry

Name: JMR 
Team:  
Date: 7/29/2008 
Entry: Today Katie and me finished the annoying drawing by just drawing everything we saw without bothering what it would mean. Then we tackeled the pit 16861 together with Maxime, in order to remove it and then be able to move over to the fills of spaces 340 and 341, which are both cut by the pit. Unfortunately, just 15cm down in the pit, we discovered another late burial showing up in its northern part. This burial will have to be removed before we can work further on the pit - roomfill issue. Sigh. 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell