Excavation Diary Entry

Name: PTW 
Team:  
Date: 8/25/2009 
Entry: Today was entirely spent drawing in space 343. I put finishing touches on my elevation drawing of features 3304 and 2426, which I had begun yesterday (25/8). TEB and I then drew the younger portion of the Northern wall (feature 5024). And then made preparations to begin drawing the elevation of the same feature. The aim for tomorrow is to remove this feature and investigate the probability of an older wall, part of the earlier construction phase, existing behind.
After two long days of drawing features, the prospect of getting my hands dirty one last time this season is a lovely thought. 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell