Excavation Diary Entry

Name: Richard Turnbull 
Team: Çatal 
Date: 8/5/1998 
Entry: 5/8/98
Excavated plaster layer [ 3159]. BM. Came up took samples for chemical analysis on section on N. side of trench through backfill and platform material. Discussed taking samples of occup. Deposit partially visible at present once it has been fully exposed. ( BM also took series of samples through plaster floor and other layers in space 150 and the south of space 151 where TC working. ) Visited in turn by Goddesses and then priority tour - great interest in occupation deposits occup. deposit [3148] etc. excavated yesterday to be prioritized, and will prioritize a couple of units from next occupation deposit. Planned/excavated [3160] - small layer of make-up ? to plaster [ 3159]. Planned/excavated layer [3165], [3177] more extensive layer that maybe associated with platform . One more unit of this layer [3178] still to excavate. But more plaster is being revealed below.Entered By: Richard Turnbull 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell