Excavation Diary Entry

Name: XHB 
Team:  
Date: 8/14/2010 
Entry: Today I began drawing Unit 15159 (including U.15170 and 15171, space 446 and features 3321 and 3322), with a focus on the NE corner, so that excavation work can be continued tomorrow. However, due to work at the Palaeobotany Lab and flotation the drawing has not been finished yet. 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell