Excavation Diary Entry

Name: SCS 
Team:  
Date: 8/19/2010 
Entry: Excavator's log, Catal Date: first without the boss
- and nonetheless productive. ;-)
I started with clarifying the buttress 5052 (unit 15177), which shows at the non-disturbed level some nice plasterlines and then extended my drawing of unit 15181for this abutting buttress 5052. For that I needed to set two more nails, which I measured in later. Some furious calculating (took me ages for such a simple problem) showed, that I managed to angle them at 88.75 degrees to the first two nails. Almost exactly the 90 I was aiming for. :-)
Interestingly enough I could also make a few changes in the already drawn plan of F.s 2428 and 2429: After drying out for two days, some mortar lines could be seen between mudbricks on the same level, showing the shape of a single mudbrick. See drawing 10/530.
After finishing the drawing (so far) I did a bit of brushing in sp. 340 and a bit of scratching next to BOD in her space, where we came upon some red plaster, that might be some relique of an floor or maybe rather some fallen down wall plaster. Or maybe something else. We took a foto and will see whether there is more to be found on Saturday.
Looking forward to the FreiTag tomorrow
SCS out 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell