Excavation Diary Entry

Name: XHB 
Team:  
Date: 8/22/2010 
Entry: The season is coming to an end and unfortunately I am afraid I am not going to be able to expose the whole floor in unit 15341 due to the fact that U.15194, directly to its west, needs to be completed before I can proceed. I could expose, however, ca. 30 more cm of the floor, attached to the N baulk and continuing towards the west. On the other hand, F.3330, that is, the wall to the south of the plaster floor is still unclear. I excavated both sides (N and S) of the plaster line but I could find no trace of mudbrick. 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell