Entry: | Started excavating in B.77, where Mike left off last season. Have a lot to deal with in the building, but hope to get it finished by the end of this season. Started by removing (19265), the last fragment of ‘Mike’s cupboard’ F6050. This sealed a series of fairly dirty (19626) floors on north central platform F.6062. This deposit was 1.5cm thick, and slightly thicker around the edges of the platform. Contained multiple floors.
The new 4040 shelter is airless, and unbelievably HOT. |