Entry: | Today I left CMB to finish unit 15357 on her own and started excavating unit 15366 (space 340). The walls have already been uncovered in a previous season, so I am clearing the fill, hoping to find the floor level. So far it is not overly exciting. A few inclusions, mainly sherds, but also bits of animal bones and obsidian, though all of it in very minimal volumes. However, large quantities of plaster is coming up in chunks as well. A sample was taken of a large lump of plaster from the northern end of space 340. The spaces around me seem to reach ground level about 30 cm. below my current level, so I expect to find the ground floor at about the same level in my space.
Turkish keyboards are hard to figure out, and I miss my semicolon. Insert whereever you would like to. |