Excavation Diary Entry

Name: Lucy Hawkes 
Team: Çatal 
Date: 5/10/1999 
Entry: In taking out wall 400 it became apparent that what was thought to be a southern continuation of wall 400 is in fact mixed fill containing unstructured wall material. This layer continues at the same level as the last course of brick in wall 400. It is also level all the way across so appears to have been constructed as a levelling layer.Entered By: Lucy Hawkes 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell