Excavation Diary Entry

Name: Lucy Hawkes 
Team: Çatal 
Date: 5/18/1999 
Entry: Today I have been drawing and removing wall 93. At the southern edge it has been cut in the same way as wall 400. The cut hangs over at its top edge and is then slightly undercut as it goes down. The wall is incredible tough and hard. The brick and mortar are quite different from the walls of space 159, they are more clayey and contain a lot more inclusions.Entered By: Lucy Hawkes 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell