Excavation Diary Entry

Name: TET 
Team:  
Date: 8/12/2013 
Entry: Today I took the bottom levels of unit 31127. This unit is closed now. Afterwards myself and DSE helped PAB removing the backfill of space 448. It took us several hours to finish. More or less we spent the whole day preparing the space for excavation. Later on, I took a trench tour and talked to the excavators about their sections. At the end of the trench time I talked with JMR about a cut through a wall which we are planning in order to progress our understanding of architecture. 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell