Excavation Diary Entry

Name: DSE 
Team:  
Date: 8/14/2013 
Entry: Today I have been working on a new unit (31179) of F. 3306. The task was the leveling of the unit in order to get a proper profile of the connection between this feature and F. 2429. Secondly do we intent to know, how this wall (F. 3306) is constructed. This was still unclear due to the disturbance in that area. For now we can say, that the structure of the wall is very homogenous and shows almost no brick-mortar relations. It looks like it was made of concrete – made of one big block. The reasons for that will hopefully be revealed soon. Unit 18351 could be closed during the first hour of the day. 
 
Download this Entry
Back to Diary Entry List
 