Excavation Diary Entry

Name: Erik Johansson 
Team:  
Date: 7/5/2015 
Entry: We have had a very productive couple of days in B17. The south walls of B24 and B6 are coming down and at the foundation of F.485 we came across a buchrania that the conservation team are solidifying in order for us to continue dismantling the wall.

So far the theory that there was another space in use before B6 was constructed, that belonged to B160, holds up. 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell