Entry: Building 52. One building, seven siderooms and I don't even know how many floating features! Arriving to building 52 as a newcomer has truly been overwhelming. Even my dreams are infected by ideas of how the building adds up and what phase (-es) we're currently in, in the separate spaces.

Since I arrived I have excavated a floating oven, several floating floors coming underneath the oven and trying to work out the connection between space 92 and space 94, where currently there is a wall, separating the two. A floating wall, obviously.

The biggest task, so far, has been to track back what I'm currently excavating to what was excavated in 2008, which has been enormously difficult. The take home message should be that one should allways make the discussion field in the unit sheet, into a discussion! It would have made my work a lot easier. But where is the fun in that? 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell