Excavation Diary Entry

Name: Doru Bogdan 
Team: Çatal 
Date: 8/5/2005 
Entry: The excavation of Building 52 was finished today. We got the building down to the level is going to stay for now (and forever probably) and also our understanding of the stratigraphic relationships in the area is a lot better now.
We seem to agree that B 52 was a lot larger than spaces 93 and 94 and that after its collapse, B51 was built literaly in it. This seems to have been the case of Building 1 as well. I got to go now but I'll be back. Hopefully!Entered By: Doru Bogdan 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell