Excavation Diary Entry

Name: Roddy Regan 
Team: Çatal 
Date: 7/9/2006 
Entry: Been away in France for a week and been back for a couple of days now. While i was away Candemir had a couple of days off while the skeleton in the N platform F. 2059 took up most of the rest of his time, so nothing much had changed by the time I returned. We have now removed the last bits of Building 56 internal features, namely the construction make ups for platform F. 2058 and F. 2059. This has revealed the eastern and north walls of the building below. We are now in the painful process of removing the walls of building 56, i say painful because we have 9 lengths of wall all with individual feature numbers and up to three unit numbers all needing described sampeled and data entried as well as being physically removed, oh well. Candemir has also begun to take down space 123 at the west which will hopefully tie us in to the Mellart section. Big sweaty units to come !Entered By: RR 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell