Excavation Diary Entry

Name: Günes Duru 
Team: IST 
Date: 7/26/2006 
Entry: Tell me diary at once! Who is writing the best? Who is more scientific, who is more poetic, who is politic, who is keeping the rules more..
George works in 12496 and 13907, our aim is to find the missing wall of south wall of the Building 63. Pits, late disturbances make our lives difficult. But finally I think we find some parts of the wall under 12496. Heval is cleaning the cluster 13904. We thought that "another stone worker was walking around Building 63" (we found more than 30 stone objects in Building 63). 13904 was not really deep, it was ca. 5-10 cm pit but we have had already 2 bones, 22 stone objects possibly used for different functions. He also found a strange bin? We record it as F1999. It is oval shaped, very well plastered and it is deeper than 45cm. There are many stones and bones and obsidian, we have not collected yet. But we think it could be a boiling pit/bin. Its location seems like it is out of the building, an external area? This is strange for Catalhoyuk ha? "each house has its own productive economy" Ece and Turhan work on space 301, cleaning and searching floor. Nothing really changes. Today was a priority day, but we did not have any today. We just showed the new staff. Everything for exchanging knowledge...Does it work much? No, does not, everybody knows everything "alle fierra dell’est (all pride to the east). On the way to the West Mound Mihriban and I discussed about next year's plans, yes, we have to open new trenches out of the fence, on the other side of the road and go deep.Entered By: Gunes Duru 
 
Download this Entry
Back to Diary Entry List
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell