Displaying Diary Entries for Feature = 10 |
Page 1 of 1 (Total Records: 5)
|
Name: | Gavin Lucas |
Team: | Çatal |
Date: | 8/28/1997 |
Entry: | Just a quickie - F.37 platform walls (F.8 and F.10) now coming down along with the rest of F.3; the rest is proceeding well. However, two new burials emerged today cut through the sub-floor infill layers but sealed by the primary floors and packing of Bui... click here for more... |
|
Name: | Roger Matthews |
Team: | Çatal |
Date: | 8/26/1996 |
Entry: | Another solid day of recording - we have now produced a marvellous 1:20 plan of Building 1, with much detail on it - levels, slopes, plaster lines, Munsell colours etc. It will serve as a base map for all future analyses of the building and its contents. ... click here for more... |
|
Name: | Roger Matthews |
Team: | Çatal |
Date: | 9/5/1996 |
Entry: | We have been blown off site this afternoon, with no work possible after lunch. There is a terrific wind blowing from the west and filling our shelter with dust. We tried to tie down the canvas sides but that just put all the strain on the wooden frame whi... click here for more... |
|
Name: | Gavin Lucas |
Team: | Çatal |
Date: | 8/11/1997 |
Entry: | Arrived almost two weeks ago but the first week was taken up with the construction of the steel shelter over Ruth's area, just adjacent to the North; unfortunately, this took a much longer time than anticipated and in the end a professional construction t... click here for more... |
|
Name: | Gavin Lucas |
Team: | Çatal |
Date: | 8/24/1997 |
Entry: | Excavation of the wall moulding F.24 on the south wall proved to have a similar two phase construction as F.26 although the primary phase [2140] was more akin to a plaster pilaster than plaster around a timber; however, the form of this was more ambiguous... click here for more... |
|
|