Displaying Diary Entries for Feature = 231 |
Page 1 of 1 (Total Records: 4)
|
Name: | Craig Cessford |
Team: | Çatal |
Date: | 8/6/1998 |
Entry: | End of week three and progress continues to be quite good. In space 156 Åsa seems to have almost reached the level of the floors and has begun taking out the second half of the room, so far no features have appeared. The blocking between spaces 156 and 15... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 8/26/1998 |
Entry: | Åsa 26-8
Work in space 156 has slowed down since the walls have caused some extra consideration. As the northern wall, the southern and part of the western wall had the floors going under them I had to find out where the floor met the walls.
But firs... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 9/1/1998 |
Entry: | In space 156 work with the walls have continued. About the western wall (F227) and the inner support (3298) I got some feed back from the specialists during the priority tour today. I made the picture more complicated I'm afraid. The question is how the l... click here for more... |
|
Name: | Åsa Berggren |
Team: | Çatal |
Date: | 9/10/1998 |
Entry: | Åsa 10-9
Last diary entry.
The blocking (F249) between space 156 and 157 in building 5 has now been removed. It consisted of a nice little row of bricks and mortar (units 3881 and 3882). Another material (3880) was put against its northern face maybe ... click here for more... |
|
|