Displaying Diary Entries for Feature = 2455 |
Page 1 of 1 (Total Records: 7)
|
Name: | Christoph Skowranek Doru |
Team: | West-Buffalo/Camb |
Date: | 8/2/2006 |
Entry: | The weather today was very hot with a lack of wind, but under the shelter it is very comfortable to dig.
After a discussion with Shahina and Ian we changed our priorities to excavate the graves which we could cleared yet.
So the members of our part of t... click here for more... |
|
Name: | Christoph Skowranek Doru |
Team: | West-Buffalo/Camb |
Date: | 8/3/2006 |
Entry: | The hottest day since we start working
Work is still going on in Trench 6, today I tried to finish the paperwork so far, a lot of measurments and drawings to do.
Today there were four students Selcuk University working on site, on the grave in the north... click here for more... |
|
Name: | ER |
Team: | West-Buffalo/Camb |
Date: | 8/6/2006 |
Entry: | Yesterday, while the Cambridge team was in Cappadocia, the rest of us made a nice trip to the Karaman museum and Can Hasan, where we had a look at French's trenches (unfortunately now used as rubbish dumps) and at the pottery.
Today, full team except ... click here for more... |
|
Name: | Helen Lomas |
Team: | West-Buffalo/Camb |
Date: | 8/6/2006 |
Entry: | Hottest day so far apparently, though didn’t feel it so badly in my strangely angled hole in trench 6. The Selcat team had exposed a mudbrick burial cut extending into the profile, with a layer of collapsed (or possible grave cover?) mudbricks haphazardly... click here for more... |
|
Name: | Christoph Skowranek Doru |
Team: | West-Buffalo/Camb |
Date: | 8/6/2006 |
Entry: | After having a nice Trip to Can Hasan and Taskale we started digging today. It was extremely hot, at the moment every day seems to be hotter than the day before.
In trench 6 today missed the team from Selcuk university, who had a seminar day today.
W... click here for more... |
|
Name: | Christoph Skowranek Doru |
Team: | West-Buffalo/Camb |
Date: | 8/7/2006 |
Entry: | Another day of excavation. Today it was not so hot, cause we had a little wind coming under the shelter.
To finish the excavation there is a horrible mass of work to do. not only the excavation work, we are also forced to finish all units we decided to w... click here for more... |
|
Name: | Christoph Skowranek Doru |
Team: | West-Buffalo/Camb |
Date: | 8/8/2006 |
Entry: | Windy day today, not so hot, workable weather.
In Trench 6 the work is still going on, but just the Features next to the southern Trenchedge (F2454, F2456) were today finished, thanks to Naoise, who did a great job!
Helen finally exposed the skeleton (1... click here for more... |
|
|