Name: JMR 
Team:  
Date: 8/15/2010 
Entry: PTW removed the possible installation F.3325 today (the "bukranium"). It sits on a strange bump of plaster, mortar and mud brick (?), but does not seem to be an installation, as I believe - rather a coincidence. He also found the continuation of the floor... click here for more... 
 
Name: JMR 
Team:  
Date: 8/17/2010 
Entry: SCS continued working on the clarification of Features 2429, 2428, 3327, 5052 and 3320. Unfortunately, the decision abutting/ binding into for F.2428 and 5052, and also 2429 and 3327, is still not possible - partially because of the rodent holes and parti... click here for more... 
 
Name: BOD 
Team:  
Date: 8/18/2010 
Entry: Progress for today: first time I've put on a long-sleeve top in the morning. Maybe it's dropped to under 40C? Regarding the floor I wrote about yesterday (U.15170, 15191, 15190), discussion with Roddy from the East Mound shows that our floor follows a ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/19/2010 
Entry: LKH continued fill unit 15194. XHB exposed floor U.15341 further (fill above: 15196). It is still continuing towards west, but considerably sloping downwards in that part. He stopped cleaning the floor to make a section through the fill above (15196) in t... click here for more... 
 
Name: BOD 
Team:  
Date: 8/23/2010 
Entry: Last excavation day. After a big push downwards in space 450 yesterday (about 40cm down), today was spent extending the same level to space 452. Then – polishing the buttresses' plaster, smartening out the profiles, emptying meep-holes, etc. In sum, movin... click here for more... 
 