Name: | JMR |
Team: | |
Date: | 8/8/2011 |
Entry: | Apart from room fill excavation, we set out on a wall finding mission today, trying to define the walls in the trench extension that we have been seeing and feeling for a while, but which are still clouded by disturbances. We want to identify these walls ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/10/2011 |
Entry: | Second last day in the trench, and a exciting day. Apart from very nice small finds, and in general many finds, we attributed two new building numbers: The building encompassing Spaces 310 and 454 is now Building 106, since its southern wall (F.3352) was ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 7/30/2012 |
Entry: | SO and EUR finished taking out the compact uppermost layer of room fill in southern Building 105 (16997) until coming down to softer fill which will be taken out with a new unit number. During the fill removal, EUR uncovered the long expected southern but... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/5/2012 |
Entry: | Building 105 starts to get very complicated. CMF and FKJ continued excavation in its northern part. CMF found a layer of fill in the NW corner that was very different from its surrounding (darker, looser, with very many finds) and that she determined to b... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/4/2012 |
Entry: | Exciting day in B.106. KTX started the day wanting to take down the southern half of buttress F.3301 down to the preparation plaster layer 16999. While doing so, we had to face again the many plaster layers (so far summarised as 16932) in the corner of F.... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/7/2012 |
Entry: | Exciting day in B.105. During room fill removal in both parts of the building (north – 17280, south – 17283), more and more construction features started showing up. Also, 17280 looks very different from the usual West Mound room fill. In this layer of bu... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/13/2012 |
Entry: | Today we had a lot of action in the trench, as five students from Southampton University are joining us for three days.
Three of them were working with DLG, moving a lot of soil in Building 107 (16988), uncovering features and finding loads of artefact... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/20/2012 |
Entry: | CMF and EUR brushed their Building 105 for its first 3D-Scan. After this, CMF started on removing wall F.3349, which turned out to be quite disturbed, and uncovered nicely the tops of walls F.3352 and F.3350, starting from the northern part moving south. ... click here for more... |
|
Name: | FKJ |
Team: | |
Date: | 8/7/2012 |
Entry: | In the newly opened unit 17280 we removed about 20 cm in depth of room fill. Near feature 3365 some big potsherds were uncovered. There were fewer sherds than yesterday. Compared to the preceding layer of room fill (u. 17272) the potsherds we found were l... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/22/2012 |
Entry: | Last day of excavation.
CMF and EUR did some small scale work on their collapse layer in sondage 18370, exposing a cluster of plaster fragments. The rest of this layer will be fore next year.
KTX removed the rest of buttress F.3301, exposing more of... click here for more... |
|
|