Displaying Diary Entries for Feature = 3357 |
Page 1 of 1 (Total Records: 2)
|
Name: | JMR |
Team: | |
Date: | 8/15/2011 |
Entry: | On the last day of excavation, 11.8., we noticed during cleaning a wall under F.5058 that was built from different material and plasterless (F.3358); apparently there is a package of fill between the top of F.3358 and the base of F.5058. After this observ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 7/22/2012 |
Entry: | In preparation of the removal of Buildings 106 and 107, PTW and KTX continued cleaning them from backfill remains. We also decided to record them with 3D photography tomorrow before starting to take out walls. It is ideal that we can record the buildings ... click here for more... |
|
|