Displaying Diary Entries for Feature = 3359 |
Page 1 of 1 (Total Records: 4)
|
Name: | JMR |
Team: | |
Date: | 8/15/2011 |
Entry: | On the last day of excavation, 11.8., we noticed during cleaning a wall under F.5058 that was built from different material and plasterless (F.3358); apparently there is a package of fill between the top of F.3358 and the base of F.5058. After this observ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 7/22/2012 |
Entry: | In preparation of the removal of Buildings 106 and 107, PTW and KTX continued cleaning them from backfill remains. We also decided to record them with 3D photography tomorrow before starting to take out walls. It is ideal that we can record the buildings ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 7/26/2012 |
Entry: | We spent yesterday and today following the plans we made in the strategy discussion on Tuesday.
PTW continued exposing buttresses F.3355 and F.3356 in Building 107/Space 462, which is a time-consuming thing as firstly a lot of soil has to be moved and... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/20/2012 |
Entry: | CMF and EUR brushed their Building 105 for its first 3D-Scan. After this, CMF started on removing wall F.3349, which turned out to be quite disturbed, and uncovered nicely the tops of walls F.3352 and F.3350, starting from the northern part moving south. ... click here for more... |
|
|