The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 3359

Page 1 of 1 (Total Records: 4)
Name: JMR 
Team:  
Date: 8/15/2011 
Entry: On the last day of excavation, 11.8., we noticed during cleaning a wall under F.5058 that was built from different material and plasterless (F.3358); apparently there is a package of fill between the top of F.3358 and the base of F.5058. After this observ... click here for more... 
 
Name: JMR 
Team:  
Date: 7/22/2012 
Entry: In preparation of the removal of Buildings 106 and 107, PTW and KTX continued cleaning them from backfill remains. We also decided to record them with 3D photography tomorrow before starting to take out walls. It is ideal that we can record the buildings ... click here for more... 
 
Name: JMR 
Team:  
Date: 7/26/2012 
Entry: We spent yesterday and today following the plans we made in the strategy discussion on Tuesday. PTW continued exposing buttresses F.3355 and F.3356 in Building 107/Space 462, which is a time-consuming thing as firstly a lot of soil has to be moved and... click here for more... 
 
Name: JMR 
Team:  
Date: 8/20/2012 
Entry: CMF and EUR brushed their Building 105 for its first 3D-Scan. After this, CMF started on removing wall F.3349, which turned out to be quite disturbed, and uncovered nicely the tops of walls F.3352 and F.3350, starting from the northern part moving south. ... click here for more... 
 