Displaying Diary Entries for Feature = 3367 |
Page 1 of 1 (Total Records: 5)
|
Name: | JMR |
Team: | |
Date: | 8/8/2012 |
Entry: | In Building 106, KTX drew and photographed plans and details of wall F.5058 and buttress F.3301. After recording, he started to take the southern part of F.5058 down to the brick layer we chose to uncover entirely, as an example. Southern F.5058 is still ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/9/2012 |
Entry: | Today after breakfast we had a very nice trench tour, during which everybody talked about their area and we discussed details of the contexts and the strategy for the following days.
GWN and JHB spent the day in B.98 wrapping up the contexts we have ti... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/18/2013 |
Entry: | CMP did some more wall clarification in B.107 today. In the NW corner, she found only two wall phases on top of each other, as seen last year as well. After removing some remaining areas of fill from walls all around the building, and emptying a few roden... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/19/2013 |
Entry: | CMP is working further on construction features in B.107. She cut the potential posthole 31197 and at the same time what seems to have been a protruding older wall under F.2426 and after a bit of excavation turns out to have been fill (with not many inclu... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/21/2013 |
Entry: | What a day. So much progress.
Towards the middle of the day I got quite stressed, though. B.107. Who would have thought that this would turn out so complicated. Also, I hate those meep meep rodents.
CMP cut a NS section into a part of the eastern wa... click here for more... |
|
|