Displaying Diary Entries for Feature = 3373 |
Page 1 of 1 (Total Records: 5)
|
Name: | JMR |
Team: | |
Date: | 8/20/2012 |
Entry: | CMF and EUR brushed their Building 105 for its first 3D-Scan. After this, CMF started on removing wall F.3349, which turned out to be quite disturbed, and uncovered nicely the tops of walls F.3352 and F.3350, starting from the northern part moving south. ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/4/2013 |
Entry: | The team arrived on Friday and cleaned the trench yesterday (Saturday) and today. After cleaning, photos were taken and then excavation started.
GWN, ASO and EIH are working in B.98. The aim for this season is to find out what is under floor 16977. For... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/8/2013 |
Entry: | This is a diary for the 6th and 7th August. Currently we are on a 3-day Bayram excavation break, there is no work being done in the trench on the 8th, 9th (Friday anyway) and 10th August.
TET and DAB started removing room fill layer 31127 in Space 310.... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/11/2013 |
Entry: | Finally excavating again. All that sitting in the office is too much.
In B.107, we continued what we started. CMP drew the wall succession F.3373-3304-2426, with the fill between F.3373 and F.3304 being really clear, but F.3373 itself rather fuzzy towa... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/19/2013 |
Entry: | CMP is working further on construction features in B.107. She cut the potential posthole 31197 and at the same time what seems to have been a protruding older wall under F.2426 and after a bit of excavation turns out to have been fill (with not many inclu... click here for more... |
|
|