The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 3374

Page 1 of 1 (Total Records: 4)
Name: JMR 
Team:  
Date: 8/20/2012 
Entry: CMF and EUR brushed their Building 105 for its first 3D-Scan. After this, CMF started on removing wall F.3349, which turned out to be quite disturbed, and uncovered nicely the tops of walls F.3352 and F.3350, starting from the northern part moving south. ... click here for more... 
 
Name: JMR 
Team:  
Date: 8/4/2013 
Entry: The team arrived on Friday and cleaned the trench yesterday (Saturday) and today. After cleaning, photos were taken and then excavation started. GWN, ASO and EIH are working in B.98. The aim for this season is to find out what is under floor 16977. For... click here for more... 
 
Name: JMR 
Team:  
Date: 8/11/2013 
Entry: Finally excavating again. All that sitting in the office is too much. In B.107, we continued what we started. CMP drew the wall succession F.3373-3304-2426, with the fill between F.3373 and F.3304 being really clear, but F.3373 itself rather fuzzy towa... click here for more... 
 
Name: JMR 
Team:  
Date: 8/12/2013 
Entry: Today, TET, DSE and PAB worked together at removing sandbags out of Space 448 and finished towards the end of the day. The space looks quite good; we have not seen it since the end of the 2010 season. After a bit of cleaning, it will be as good as new. ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell