Displaying Diary Entries for Feature = 3376 |
Page 1 of 1 (Total Records: 5)
|
Name: | KTX |
Team: | |
Date: | 8/20/2012 |
Entry: | Work in B.106 this week was spent doing minor excavations to fully expose the layer of mud bricks in walls F.5058 and F.3351. Work in the corner of these walls proved that the previous idea that smaller individually sized bricks were used to construct the... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/20/2012 |
Entry: | CMF and EUR brushed their Building 105 for its first 3D-Scan. After this, CMF started on removing wall F.3349, which turned out to be quite disturbed, and uncovered nicely the tops of walls F.3352 and F.3350, starting from the northern part moving south. ... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/17/2013 |
Entry: | CMP worked further on clarifying walls in B.107 – SW corner by removing fill 31168. It is now clear that the wall under F.2426 in this corner has a slightly different outline/size and reaches further into the room than F.2426 (ca. 15cm). It has a very irr... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/21/2013 |
Entry: | What a day. So much progress.
Towards the middle of the day I got quite stressed, though. B.107. Who would have thought that this would turn out so complicated. Also, I hate those meep meep rodents.
CMP cut a NS section into a part of the eastern wa... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/26/2013 |
Entry: | This is a dairy for 25th August – the last excavation day in Trench 5 for this season – and forever.
DSE in Space 310 removed the marl lumps he uncovered in removing layer 31232 and during removal confirmed that the marl did not form constructed featur... click here for more... |
|
|