Displaying Diary Entries for Feature = 3377 |
Page 1 of 1 (Total Records: 7)
|
Name: | JMR |
Team: | |
Date: | 8/13/2013 |
Entry: | JHB and JMK removed the bins, which are now called F.3377, nicely sampling all the removed construction and fill. We had a discussion about whether or not this actually is a construction feature, or some unfortunate erosion/rubbish – I so far believe the ... click here for more... |
|
Name: | JMK |
Team: | |
Date: | 8/17/2013 |
Entry: | August 17, 2013
Today I finished the rest of the section I was working on. First, I excavated the floor sections, and then the fill that was under the floor. When that was finished, I had just begun making sure that the section walls were straight and al... click here for more... |
|
Name: | JMK |
Team: | |
Date: | 8/17/2013 |
Entry: | August 15, 2013
I made a lot of progress in my area today. I continued with U.31130, and got all the way to the end of the fill from U.31183 (the parts not overlain by the floor sections). U.31130 was pretty straightforward, with a few artifacts (bone, p... click here for more... |
|
Name: | JMK |
Team: | |
Date: | 8/17/2013 |
Entry: | August 14, 2013
This morning before breakfast, I was able to finish the sondage (U.31114) that I began excavating earlier in the season. I finished excavating, taking bottom levels, and sorting artifacts, the latter of which took quite a while due to the... click here for more... |
|
Name: | JMK |
Team: | |
Date: | 8/17/2013 |
Entry: | August 13, 2013
Today JHB and I worked again in the basin/bin/we’re-not-really-sure feature (F.3377). We continued to remove the units (we began removing the fill units yesterday), taking each separately. Since the standard archive + flotation samples am... click here for more... |
|
Name: | JMK |
Team: | |
Date: | 8/17/2013 |
Entry: | August 12, 2013
This morning before breakfast I worked on the last bit of my sondage. I found very few artifacts. The original idea was for me to finish my sondage and then move to JHB’s unit, where he was excavating an interesting arrangement of bins. H... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/19/2013 |
Entry: | CMP is working further on construction features in B.107. She cut the potential posthole 31197 and at the same time what seems to have been a protruding older wall under F.2426 and after a bit of excavation turns out to have been fill (with not many inclu... click here for more... |
|
|