Name: Stella Macheridis 
Team:  
Date: 6/30/2013 
Entry: Our pod of three (me, Jedrzej and Yunuz) started excavations of B. 102 yesterday, first started the last days of the 2012 season. In S17 a floor level was reached last year, but wasn't found in S18, and not even in a sondage cut they made in the middle of... click here for more... 
 
Name: Stella Macheridis 
Team:  
Date: 7/3/2013 
Entry: Since my last entry I have been doing all sorts of things. But more importantly we have removed some features (1) and started some (2 possibly 3) and cleared out some problematic units in our building, 102. Actually, the clearing out has been balanced by ... click here for more... 
 
Name: Sean Doyle 
Team:  
Date: 5/31/2016 
Entry: What the heck is going on in Building 102? This entry is based on the heavy residue backlog from 2013 that I have been processing over the last several weeks (better late than never right?) Everybody has heard me going on and on about prismatic blad... click here for more... 
 