The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 40

Page 1 of 1 (Total Records: 3)
Name: Gavin Lucas 
Team: Çatal 
Date: 8/28/1997 
Entry: Just a quickie - F.37 platform walls (F.8 and F.10) now coming down along with the rest of F.3; the rest is proceeding well. However, two new burials emerged today cut through the sub-floor infill layers but sealed by the primary floors and packing of Bui... click here for more... 
 
Name: Gavin Lucas 
Team: Çatal 
Date: 9/4/1997 
Entry: Work has been really speeding up now - the make up deposits for Building 1 are being excavated fairly rapidly and it is having a tremendous impact on the appearance of the site. As far as we can ascertain, these deposits consist of single episode infills/... click here for more... 
 
Name: Gavin Lucas 
Team: Çatal 
Date: 8/11/1997 
Entry: Arrived almost two weeks ago but the first week was taken up with the construction of the steel shelter over Ruth's area, just adjacent to the North; unfortunately, this took a much longer time than anticipated and in the end a professional construction t... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell