Displaying Diary Entries for Feature = 40 |
Page 1 of 1 (Total Records: 3)
|
Name: | Gavin Lucas |
Team: | Çatal |
Date: | 8/28/1997 |
Entry: | Just a quickie - F.37 platform walls (F.8 and F.10) now coming down along with the rest of F.3; the rest is proceeding well. However, two new burials emerged today cut through the sub-floor infill layers but sealed by the primary floors and packing of Bui... click here for more... |
|
Name: | Gavin Lucas |
Team: | Çatal |
Date: | 9/4/1997 |
Entry: | Work has been really speeding up now - the make up deposits for Building 1 are being excavated fairly rapidly and it is having a tremendous impact on the appearance of the site. As far as we can ascertain, these deposits consist of single episode infills/... click here for more... |
|
Name: | Gavin Lucas |
Team: | Çatal |
Date: | 8/11/1997 |
Entry: | Arrived almost two weeks ago but the first week was taken up with the construction of the steel shelter over Ruth's area, just adjacent to the North; unfortunately, this took a much longer time than anticipated and in the end a professional construction t... click here for more... |
|
|