Entry: | The aim at the start of the season, once the original area of excavation was changed, was to finish space 117, building 2 and excavate as much of space 115 so as to release wall 406 to excavate that and make building 7 (shrine 8) safe to work in. Wall 40... click here for more... |
|
Name: | Peter Boyer |
Team: | Çatal |
Date: | 5/3/1999 |
Entry: | Peter Boyer 3rd May 1999
Its now six days since my last entry, and I have spent the intervening period working in Building 6, Space 163. Initially this involved the removal of floor make-up layers (4253, 4259) and a slumped floor deposit (4273) in an ... click here for more... |
|
Name: | Charlie Newman |
Team: | Çatal |
Date: | 5/16/1999 |
Entry: | I have now completed the excavation and recording of the Fire Installation F.416. There were further later phases to this oven, encountered as I excavated to the cut. The oven was very well constructed and has three identifiable ‘use’ phases. There is als... click here for more... |
|
|