The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 5076

Page 1 of 1 (Total Records: 5)
Name: TEB 
Team:  
Date: 8/26/2009 
Entry: Over the last few days JMR has been taking down space 310 slowly in order to expose any cultural surface that may be present. Today JMR began recording the elevations in space 310, having stopped excavating at unit 18348, suspected to be a surface. Featur... click here for more... 
 
Name: ER 
Team:  
Date: 8/27/2009 
Entry: This year's season was very efficient due to an excellent team, and as TEB has taken over the technical part of the diary I had done during the previous three years, this day of recovery from a feaverish cold is the time to summarize my view of our result... click here for more... 
 
Name: JMR 
Team:  
Date: 8/7/2010 
Entry: EMM finished documenting the present state of excavation in Space 341 and moved over to the area east of buttress F.5057, where several large potsherds became visible during excavation last year. Some of them belong to what seems to be a pit (15160, 15162... click here for more... 
 
Name: JMR 
Team:  
Date: 8/8/2010 
Entry: Exciting day in Trench 5. PTW started tackling the fill east of buttress or wall F.5075 in the eastern extension of the trench. He defined the outlines of the ceastwards continuation of wall F.5067 and verified that F.5075 is a wall connected to F.5067... click here for more... 
 
Name: PAB 
Team:  
Date: 8/24/2013 
Entry: Today was mostly moving dirt around. I and TET removed backfill from space 345 and continued removing soil south of the space in order to figure out if space 345 inhabits a structure. Inside Sp. 345 previous excavations already uncovered a buttress (F5068... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell