The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 7101

Page 1 of 1 (Total Records: 4)
Name: Rebecka Erntell 
Team:  
Date: 8/4/2012 
Entry: So, finally time has come for my last field diary entry for the 2012 season. People are going home. The trench owl made its last inspection yesterday evening, the corridors are silent and empty and there is suddenly hot water in the showers and cold water... click here for more... 
 
Name: Stella Macheridis 
Team:  
Date: 7/3/2013 
Entry: Since my last entry I have been doing all sorts of things. But more importantly we have removed some features (1) and started some (2 possibly 3) and cleared out some problematic units in our building, 102. Actually, the clearing out has been balanced by ... click here for more... 
 
Name: Stella Macheridis 
Team:  
Date: 7/9/2013 
Entry: Today we had a really interesting day in the B.102. Well, obviously, every day is interesting in our house, but today we finally can start to see same floor in both spaces, and just not bits and pieces (as it has been in S18). Having said that, it also me... click here for more... 
 
Name: Sean Doyle 
Team:  
Date: 5/31/2016 
Entry: What the heck is going on in Building 102? This entry is based on the heavy residue backlog from 2013 that I have been processing over the last several weeks (better late than never right?) Everybody has heard me going on and on about prismatic blad... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell