The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Feature = 8

Page 1 of 1 (Total Records: 7)
Name: Gavin Lucas 
Team: Çatal 
Date: 8/28/1997 
Entry: Just a quickie - F.37 platform walls (F.8 and F.10) now coming down along with the rest of F.3; the rest is proceeding well. However, two new burials emerged today cut through the sub-floor infill layers but sealed by the primary floors and packing of Bui... click here for more... 
 
Name: Roger Matthews 
Team: Çatal 
Date: 8/26/1996 
Entry: Another solid day of recording - we have now produced a marvellous 1:20 plan of Building 1, with much detail on it - levels, slopes, plaster lines, Munsell colours etc. It will serve as a base map for all future analyses of the building and its contents. ... click here for more... 
 
Name: Roger Matthews 
Team: Çatal 
Date: 8/27/1996 
Entry: We started excavating again today. Gavin and Serap took out wall 15 in Space 70. The wall comprised irregular bricks and a little plaster on its N face. The highly burnt floor of Space 70 continued beautifully under the wall, showing that wall 15 was inst... click here for more... 
 
Name: Roger Matthews 
Team: Çatal 
Date: 8/28/1996 
Entry: Work on removing the upper phase of the N half of the building went very well today, with exciting evidence already appearing directly under the floors. Louise removed the curving wall feature (Feature 20) and it came down on to a lavishly plastered surfa... click here for more... 
 
Name: Roger Matthews 
Team: Çatal 
Date: 9/5/1996 
Entry: We have been blown off site this afternoon, with no work possible after lunch. There is a terrific wind blowing from the west and filling our shelter with dust. We tried to tie down the canvas sides but that just put all the strain on the wooden frame whi... click here for more... 
 
Name: Gavin Lucas 
Team: Çatal 
Date: 8/11/1997 
Entry: Arrived almost two weeks ago but the first week was taken up with the construction of the steel shelter over Ruth's area, just adjacent to the North; unfortunately, this took a much longer time than anticipated and in the end a professional construction t... click here for more... 
 
Name: Gavin Lucas 
Team: Çatal 
Date: 8/24/1997 
Entry: Excavation of the wall moulding F.24 on the south wall proved to have a similar two phase construction as F.26 although the primary phase [2140] was more akin to a plaster pilaster than plaster around a timber; however, the form of this was more ambiguous... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell