Displaying Diary Entries for Feature = 9 |
Page 1 of 1 (Total Records: 3)
|
Name: | Roger Matthews |
Team: | Çatal |
Date: | 8/26/1996 |
Entry: | Another solid day of recording - we have now produced a marvellous 1:20 plan of Building 1, with much detail on it - levels, slopes, plaster lines, Munsell colours etc. It will serve as a base map for all future analyses of the building and its contents. ... click here for more... |
|
Name: | Roger Matthews |
Team: | Çatal |
Date: | 8/28/1996 |
Entry: | Work on removing the upper phase of the N half of the building went very well today, with exciting evidence already appearing directly under the floors. Louise removed the curving wall feature (Feature 20) and it came down on to a lavishly plastered surfa... click here for more... |
|
Name: | Roger Matthews |
Team: | Çatal |
Date: | 9/5/1996 |
Entry: | We have been blown off site this afternoon, with no work possible after lunch. There is a terrific wind blowing from the west and filling our shelter with dust. We tried to tie down the canvas sides but that just put all the strain on the wooden frame whi... click here for more... |
|
|