The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Space: 285

Page 1 of 1 (Total Records: 3)
Name: MO 
Team:  
Date: 7/14/2008 
Entry: Removal of upper floor of Building 63. Excavating in Sp. 283, the burnt room. Cleaning and following the red painted plaster on the northern face of platform 1993. The plan of the features in the building (63) and their stratigraphical positio... click here for more... 
 
Name: MO 
Team:  
Date: 7/17/2008 
Entry: Removal of the north and west walls of Building/Space 253. Removal of the hearth/fire spot under Platform 1993. Following and cleaning the red painted plaster shows the plan of the inner features in Space 285. Following the plaster we found out th... click here for more... 
 
Name: MO 
Team:  
Date: 7/27/2008 
Entry: This is our last day at Çatalhöyük. The last field day. Our work is finished in IST Area. We are very pleased with the last moment result we got just before we left: It was before the lunch break, around 12.00, Günes and me decided to make a review ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell