The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 10500

Page 1 of 1 (Total Records: 5)
Name: Beliz Tecirli 
Team: Çatal 
Date: 6/29/2004 
Entry: Today Serdar, Fatih and I mattacked our way through Mellaarts backfill in what we have (for the time being) called Rooms 26a, 26b. Our aim, in using the North, East and South walls that are visible to define the floor level of these rooms. The backfil... click here for more... 
 
Name: Beliz Tecirli 
Team: Çatal 
Date: 7/1/2004 
Entry: Today Serdar and I continued to clear the backfill of Mellaart in rooms 26a and 26b. Fatih has now left us, so its just Serdar and I churning out buckets of backfill, all on our own. We still haven't reached the base of the internal walls or any form of f... click here for more... 
 
Name: Dan Eddisford 
Team: Çatal 
Date: 7/17/2004 
Entry: Where has my entry gone?Entered By: Dan Eddisford 
 
Name: Beliz Tecirli 
Team: Çatal 
Date: 7/2/2004 
Entry: As Serdar and I continue to clear the 1960's backfill from rooms 26a and 26b, we have become concerned about the depth of the earth on the East side of our area. Shahina had suggested that we prepare 3 or 4 steps coming down from the East untill the top a... click here for more... 
 
Name: Beliz Tecirli 
Team: Çatal 
Date: 7/3/2004 
Entry: Today i drew a plan of the North facing wall of rooms 26a and 26b. The Western half of this wall had already been planned in the late 90's, therefore I've only planned the Eastern half of the wall (scale 1:20). Later on we will match the two plans for a c... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell