The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 13837

Page 1 of 1 (Total Records: 2)
Name: ER 
Team: West-Buffalo/Camb 
Date: 8/3/2006 
Entry: Team: all except Ezra plus Jonathan and Catriona, Sevgi, Leila, Nesime, Zeliha, Vildan, Arsuman Hanim and Zafer from the Selcuk team joining Weather: still hotter than yesterday Gulgun and Hanfe managed to draw the grave lining in grave 2404 (13757) t... click here for more... 
 
Name: Christoph Skowranek Doru 
Team: West-Buffalo/Camb 
Date: 8/3/2006 
Entry: The hottest day since we start working Work is still going on in Trench 6, today I tried to finish the paperwork so far, a lot of measurments and drawings to do. Today there were four students Selcuk University working on site, on the grave in the north... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell