The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 15196

Page 1 of 1 (Total Records: 5)
Name: JMR 
Team:  
Date: 8/17/2010 
Entry: SCS continued working on the clarification of Features 2429, 2428, 3327, 5052 and 3320. Unfortunately, the decision abutting/ binding into for F.2428 and 5052, and also 2429 and 3327, is still not possible - partially because of the rodent holes and parti... click here for more... 
 
Name: XHB 
Team:  
Date: 8/17/2010 
Entry: Diary entry for yesterday 16/8/2010. I devoted today's morning to drawing the section of F.3322, which turned up to be a confusing one, not being very useful when it came to clarifying whether this feature is connected to the surrounding area, especial... click here for more... 
 
Name: XHB 
Team:  
Date: 8/18/2010 
Entry: I devoted the whole of today to exposing and finding the boundaries of the new floor on unit 15196. The northern limits of the floor are determined by the baulk (it continues into the profile for most of its northern edge). Towards the east, the floor eit... click here for more... 
 
Name: JMR 
Team:  
Date: 8/19/2010 
Entry: LKH continued fill unit 15194. XHB exposed floor U.15341 further (fill above: 15196). It is still continuing towards west, but considerably sloping downwards in that part. He stopped cleaning the floor to make a section through the fill above (15196) in t... click here for more... 
 
Name: XHB 
Team:  
Date: 8/21/2010 
Entry: After a day's pause, I continued excavating the floor in unit 15341. The first thing I noticed this morning was that the plaster had dried out on some areas and had started cracking. In order to prevent this situation from getting worse in the coming days... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell