The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 16934

Page 1 of 1 (Total Records: 3)
Name: JMR 
Team:  
Date: 8/1/2011 
Entry: Exciting day in Trench 5. DLG found the plastered face of wall F.3343 (by removing U.16930, probably still disturbed room fill in Space 343). The plaster is medium thick and medium firm and well preserved, but disturbed by a lot of rodent holes. In the... click here for more... 
 
Name: JMR 
Team:  
Date: 8/6/2011 
Entry: Nice progress in the trench on Thursday and today, although several areas start to become more complicated than they seemed to be. As usual! HLS continued to expose the plaster feature U.16932. We are not that sure any more that is is a floor, although... click here for more... 
 
Name: JMR 
Team:  
Date: 8/8/2011 
Entry: Apart from room fill excavation, we set out on a wall finding mission today, trying to define the walls in the trench extension that we have been seeing and feeling for a while, but which are still clouded by disturbances. We want to identify these walls ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell