Displaying Diary Entries for Unit: 17282 |
Page 1 of 1 (Total Records: 2)
|
Name: | GWN |
Team: | |
Date: | 8/7/2012 |
Entry: |
Today’s work was concentrated out of the building 98 i.e. north space/room attached to it. Therefore a wall (U. 17281) next to the ’threshold/doorway’ was necessary to be removed. As it was just a small remain of the wall it did not take so much time fo... click here for more... |
|
Name: | JMR |
Team: | |
Date: | 8/9/2012 |
Entry: | Today after breakfast we had a very nice trench tour, during which everybody talked about their area and we discussed details of the contexts and the strategy for the following days.
GWN and JHB spent the day in B.98 wrapping up the contexts we have ti... click here for more... |
|
|