Name: TEB 
Team:  
Date: 8/9/2009 
Entry: The total station was set up today for its use in Trench 5. Two new steps were created along the western section of T5 along eastings 690 and 691. SO was excavating a suspected pit fill (18307) and its cut (18308) in space 340 that respects F2428 in t... click here for more... 
 
Name: EMM 
Team:  
Date: 8/9/2009 
Entry: For the last two days I have been working in space 341, which, after cleaning turned out to consist of two different parts, that now have the Unit number 18 313. The south-eastern part of the space is characterised by loose soil, containing less finds t... click here for more... 
 
Name: TEB 
Team:  
Date: 8/10/2009 
Entry: SRW and Ümriye were excavating room fill layer 18314 (space 343), taking it back to the new step on easting 691. This extends north and the remainder will be excavated once PTW finalises recording his suspected pit cut 18306. EMM and SO completed excavat... click here for more... 
 
Name: EMM 
Team:  
Date: 8/10/2009 
Entry: Today SO and I finished surface cleaning in Unit 18 313 (in space 340). The northern wall of the unit has a plasterline which we could not follow completely until the end of the wall because the situation in the western direction became unclear. During... click here for more... 
 
Name: EMM 
Team:  
Date: 8/11/2009 
Entry: After cleaning the spaces 340 and 341 again, the big, (probably disturbed?) unit was given the number 18 324. I began to draw this Unit, although it' s borders are not totally clear to me, because of the dry soil that looked soon after cleaning every... click here for more... 
 