The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 18362

Page 1 of 1 (Total Records: 3)
Name: TEB 
Team:  
Date: 8/9/2009 
Entry: The total station was set up today for its use in Trench 5. Two new steps were created along the western section of T5 along eastings 690 and 691. SO was excavating a suspected pit fill (18307) and its cut (18308) in space 340 that respects F2428 in t... click here for more... 
 
Name: GWN 
Team:  
Date: 8/15/2012 
Entry: Amazing day in Trench 5…little bit more and we will start to sing Trench Town Rock by Bob Marley. I continued to work in the south-western corner of building 98 and interesting information appeared. We still dig, and as the digging is progressing a necess... click here for more... 
 
Name: JMR 
Team:  
Date: 8/15/2012 
Entry: Last day with our Southampton power team. DLG, with Harish and Sam, brushed Building 107 really nicely for a 3D photo session done by PTW. After that, they started taking out wall F.3344 from the top. The reason for starting with this wall is that the ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell