The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Unit: 31116

Page 1 of 1 (Total Records: 4)
Name: JMR 
Team:  
Date: 8/5/2013 
Entry: Everybody continued working where they started yesterday. Additionally, TET and the workmen started opening and cleaning B.106 to also start excavating there. Things are going nicely, people are getting used to the architecture and recording system incr... click here for more... 
 
Name: JMR 
Team:  
Date: 8/5/2013 
Entry: Everybody continued working where they started yesterday. Additionally, TET and the workmen started opening and cleaning B.106 to also start excavating there. Things are going nicely, people are getting used to the architecture and recording system incred... click here for more... 
 
Name: JMR 
Team:  
Date: 8/8/2013 
Entry: This is a diary for the 6th and 7th August. Currently we are on a 3-day Bayram excavation break, there is no work being done in the trench on the 8th, 9th (Friday anyway) and 10th August. TET and DAB started removing room fill layer 31127 in Space 310.... click here for more... 
 
Name: JMR 
Team:  
Date: 8/13/2013 
Entry: JHB and JMK removed the bins, which are now called F.3377, nicely sampling all the removed construction and fill. We had a discussion about whether or not this actually is a construction feature, or some unfortunate erosion/rubbish – I so far believe the ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries
 

main sponsors

Yapi Kredi

Ko�tas

Boeing

secondary sponsors

Konya Seker

Shell